RAID Log template for agency projects

By Osman Gani · 25 years running agency delivery · Part of the PM Hub vault

A single risk register sheet linked to a four part board showing a warning sign, an unconfirmed assumption, a raised flag and two linked dependencies

Risks, assumptions, issues and dependencies in one Google Sheet, each with an owner, a due date and a status. A dashboard shows what is overdue, how long items have been open and what to raise first in this week’s status call.

In the vault nowRAID Log

Included with founding membership, along with every other template in the vault and every one added after.

14 templates live · lifetime access · 14 day refund

What is inside

Dashboard

Open items, high priority, overdue, average age and the oldest open line at the top. Below that, open items by type and by owner, and a likelihood by impact grid for open risks.

RAID log

One line per item with type, date raised, owner, deliverable, likelihood and impact, a calculated score and priority, the response, due date, status and date closed. Days open and overdue flags work themselves out.

Project setup

Project details, the weekly report date that drives every age and overdue flag, the list of owners on both the agency and client side, and a plain English scoring guide from 1 to 5.

How to use

Eight short steps, what the cell colours mean, and the four ways RAID logs usually go wrong.

How to use it

  1. Make a copy and enter the project, the client and everyone who will own lines in the log.
  2. Add one line per item and pick its type. Score risks for likelihood and impact; everything else takes an impact score.
  3. Give every line an owner, an action and a due date. A line with no owner is a note, not an action.
  4. Review open items in the weekly status meeting, oldest first. Five minutes is usually enough.
  5. When something is resolved, set it to Closed with the date rather than deleting it. Closed lines are your record.

Who it is for

Agency project managers, account leads and heads of delivery running client work with several people involved on both sides. It is pitched at people already doing the job, not at a certification syllabus.

Questions

What is the difference between a RAID log and a risk register?

A risk register tracks things that might happen. A RAID log also tracks the assumptions your estimate rests on, the issues that are already live, and the things you are waiting on from other people. On agency work, those are usually what moves the date.

How often should a RAID log be reviewed?

Weekly, inside the status meeting you already hold. Review open items only, oldest first. A log that is only opened at kickoff describes a project that no longer exists by month two.

Who should own lines in the log?

A named person for every line, on either side. Client owned lines still need someone at the agency who chases them, or they sit open for weeks.

Does it work in Excel?

It is built in Google Sheets. You can download it as an Excel file from the File menu, and the formulas carry across.